1,600 m² / Production and storage hall
GRESCHBACH Industrie & Stahlbau GmbH, D-79336 Herbolzheim
The TM Mechanic 7 mm PVC tiles were used for a production and storage hall with high loads. The quick and easy installation meant that downtimes were kept to a minimum and the floor was immediately ready for use. This and the high resilience of the tiles were a decisive factor for the customer for an area of 1,600 m².